Solar Panels In Armagh

First Class Solar has installed hundreds of solar panels in Armagh, in towns and cities from Armagh itself, to Portadown, Killylea, Poyntzpass, Craigavon and Lurgan.

Domestic Solar Panels & Battery Systems | Solar panels NI

Request Pricing
You’re just one step away from getting started with First Class Solar
17 solar panels in Armagh, estimated yearly savings of £1,496

What Savings Should I Expect From My Solar Panels in Armagh?

Solar panels in Armagh provide savings on electric bills to each home, and we’ve listed some estimated savings over one year from different systems in a few areas below: 

  • £827 – Portadown: 12 panels
  • £1,496 – Armagh: 17 panels 
  • £833 – Armagh: 13 panels
  • £898 – Armagh: 10 panels 
  • £1,872 – Poyntzpass: 19 panels 
  • £784 – Craigavon: 12 panels 
  • £1,213 – Lurgan: 16 panels 

Depending on your system size, roof angle and current expenditure on electricity, the savings from a PV system can change, so get in touch with us if you’d like to work out what your savings from solar panels would be!

How Long Does It Take to Get Solar Panels Installed?

Once you’ve contacted the First Class Solar team, our team will then get back to you within 3 working days. We’ll get a bit more information about the system you’re looking for, your roof type and your current electric spend, and they can then design a system using our industry-leading software. 

Our technician then arranges an in-person appointment to ensure that your home is suitable and works with you to make any necessary notes or changes to the system. And then the decision is left in your hands! Once you’ve agreed to 25+ years of savings from your solar system and signed the contract, it’s about 2-6 weeks before you have your First Class Solar system installed.

Installation is usually completed in one day, and your system is switched on the same day, so you start saving immediately! We’ve included a case study below of a PV system with 12 solar panels in Antrim.

10 solar panels in Armagh, estimated yearly savings of £898

Case Study: Killylea

This home in Killylea has three–phase power, which allows for a larger PV system within NIE requirements, compared to the more common single-phase residential properties. The customer chose to put the panels on their detached garage which has a slate roof and faces 15 degrees east of perfect south – ideal for solar.

Alongside the twenty-four 435W panels, we fitted a three-phase 10kW hybrid (battery-ready) inverter in the garage. At the time of installation, the customer wasn’t ready to make the financial commitment to a battery, but having the hybrid inverter fitted meant that this would be compatible with a battery down the line – no need for a new inverter!

The Solar Savings

Electric bill before solar: £300/month 
Electric bill after solar: £143/month

ANNUAL SAVINGS: £1,912 
Payback period of 4 years, 3 months.

One Year Later

About a year after the initial installation, the customer contacted us about fitting a 10kWh battery in the garage, alongside the inverter. In order to make the battery install work, we needed to get a duct put in from the garage to the NIE meter on the main home. 

First Class Solar arranged for the works, and the 10kWh Soluna battery was then installed. The battery now fills up with the solar energy during the day and can be charged on the darker days and overnight on the cheaper EV tariff. This has led to even more savings, and another really happy solar panel owner in Armagh, installed by First Class Solar!

We're Closed for Christmas

Merry Christmas and Happy New Year! The First Class Solar offices are closed until 9am on 6 January 2025. 

If you’d like to get in touch, please reach out via email on info@firstclasssolar.co.uk

Our skeleton team will aim to respond to any urgent enquiries within 72 hours. All other queries will be addressed when our offices re-open. Thank you!